![]() |
got asked to do this side work job it’s a big freezer and they need everything off the top to get it through the door. So I need to recover the gas disconnect, the convention unit evaporator all the wiring, and then put it back when it gets to the guy’s house This would be my first side job I don’t do the numbers at work so I have no idea what to charge. Any ideas? [link] [comments] |

No comments:
Post a Comment